Project Portfolio

A selection of completed mandates – condensed, anonymised, with a clear focus on outcomes.

In the overview below we deliberately omit client names and granular detail – out of respect for confidentiality and the trust on which our engagements are built.

Inspection Aftermath

Client: global, mid-sized · Duration: 2.5 + 2 months · Area: Wholesale / QA

Scope: Eliminate an APQR backlog of 200 reports within 10 weeks and build sustainable systems for ongoing compliance.

Result: Backlog fully eliminated, re-inspection readiness restored; supporting systems prevent recurrence.

Vaccine PPQ

Client: global, large · Duration: 2.5 months · Area: Pharma, QM

Scope: Establish an optimised PPQ schedule and FMEA to ensure timeline adherence on a delayed project.

Result: Optimised PPQ schedule delivered, FMEA finalised, schedule stabilised.

QUASY™

Client: internal · Duration: 10 months · Area: QMS

Scope: Build a QMS engine that makes an “instant QMS” available for SMEs.

Result: Standalone tool QUASY™ released; ongoing extensions into new areas (currently MedTech).

Procurement Compliance

Client: global, mid-large · Duration: 5 months · Area: Biotech, Procurement / QA

Scope: Map procurement risks, develop and implement mitigation – for a fast and compliance-ready supply base.

Result: Established interface function across Supply Chain, QA, Purchasing, and QC; built and rolled out a training plan; co-optimised the material qualification process.

Interim Manager

Client: global, mid-large · Duration: 4 months · Area: Biotech, Procurement / QA

Scope: Interim coverage of the role until a suitable permanent hire was in place.

Result: Role profile built, candidate interviews conducted; ongoing compliance in deviation and change-control management secured; open supplier qualifications closed out.

Sourcing Risk Mitigation

Client: global, mid-large · Duration: 12 months · Area: Biotech, Procurement / QA

Scope: Increase the overall robustness of sourcing – from material qualification through to audit readiness.

Result: Material qualifications completed on time, supplier qualifications cleaned up, “true” supply chains for critical materials mapped to source, second-source concept implemented, balanced scorecards introduced as steering instrument, SPOC for internal audits towards procurement, inspection readiness for new authorities established.

Quality Technical Agreement

Client: national, mid · Duration: 8 months · Area: Pharma

Scope: Maternity-leave coverage in QTA / QAA management.

Result: Backlog progressively reduced during the leave period.

Backlog Elimination

Client: national, mid · Duration: 12 months · Area: Pharma

Scope: Full elimination of an existing QTA / QAA backlog.

Result: Backlog fully eliminated.

Create and Implement a QMS

Client: national, small · Duration: 8 months · Area: Biotech, QA

Scope: Build a workable QMS that enables commercialisation.

Result: Full QMS established, transferred into a new eQMS, three new staff onboarded to secure ongoing compliance.

N2K Expert / Eliminating Deviation Backlog

Client: global, large · Duration: 4 months · Area: Pharma, QA

Scope: Eliminate an existing deviation backlog.

Result: Backlog fully cleared and delays in the relevant deviations resolved.

Creating an API Wholesaler

Client: national, small · Duration: 8 months (part-time) · Area: API Wholesale

Scope: Compliance-side support for the build-up of an API wholesale operation.

Result: Interim Managing Director per Trade Law, turn-key business solution, QMS, commercial filings, SMF and SOPs created; agency inspections defended, supplier audits performed – concluded with a granted GDP licence.

Rescue a Failed Submission

Client: national, small · Duration: 2 months · Area: Wholesale

Scope: Fix a rejected filing and address the underlying QMS gaps.

Result: QMS gaps and system checks addressed, procedures updated, staff retrained, storage mapping reports rebuilt; inspection prep and response letter handled – led to the desired GDP certificate.

Process Validation

Client: global, large · Duration: 18 months · Area: Pharma / PV

Scope: Support process validation for three new drugs.

Result: Lifetime validation, hold-time validation, PPQ, continued validation reporting, regulatory filing prep, agency response support.

Agreement Backlog Fixture

Client: national, mid · Duration: 6 (+6) months · Area: Pharma

Scope: Reduce an existing QTA / QAA backlog.

Result: Backlog substantially reduced; extension halted due to recession-driven budget pressure.

Wholesale RP

Client: national, mid · Duration: ongoing · Area: Wholesale

Scope: Hold the Responsible Person function, maintain QMS, ensure GDP compliance.

Result: Engagement ongoing.

Project Management Veterinary

Client: global, large · Duration: 10 months · Area: Veterinary

Scope: Interim project management for production equipment.

Result: More than 20 small equipment projects delivered from URS to completion (depending on the takeover stage and tenure end).